- What This One-Page Sheet Covers (and What It Doesn't)
- Identity, Format and Passing Score at a Glance
- Hardware Block: Relays, PLC Sections, I/O and Memory
- Scan Cycle and Addressing Facts
- Number Systems and Boolean Quick Reference
- Ladder Logic and Programming Techniques
- HMI, Protocols and Networks
- Troubleshooting With the PLC
- Allen Bradley vs. Siemens: Keep the Records Separate
- Cost, Eligibility and Registration Mechanics
- A Domain-Ordered Review Plan
- Frequently Asked Questions
- FPABS here means Fundamentals of PLCs - Allen Bradley/Siemens, a Festo Industry Certification Program Level 1 credential administered through NC3.
- Students need an exam score of at least 70%, plus completed hands-on labs and training by an NC3-certified instructor.
- Virginia's records list 50 test items per platform exam; Allen Bradley and Siemens are separate examination records.
- The 14 preparation topics are unweighted, so spread your review evenly instead of chasing a guessed blueprint.
What This One-Page Sheet Covers (and What It Doesn't)
This cheat sheet condenses the fourteen preparation topics Festo publishes for its Fundamentals of PLC curriculum into a fast-review format. It is built for the final stretch before your exam, when you need to confirm that the core facts are sitting in memory rather than learn them from scratch. If you are earlier in your preparation, start with the FPABS study guide and come back to this page for consolidation.
A few honest boundaries. Festo's published topic list is a preparation curriculum, not a verified formal exam blueprint, and no official percentage weights were verified. This sheet therefore treats all fourteen topics as equally worth reviewing. It also contains no leaked questions and no model-specific exam requirements, because none are documented. For the full topic-by-topic breakdown, see the FPABS exam domains guide.
Identity, Format and Passing Score at a Glance
Get the credential's identity straight first, because several unrelated certifications share similar abbreviations. The facts below apply to this credential only.
| Item | What is documented |
|---|---|
| Program | Festo Industry Certification Program (FICP), Level 1 Fundamentals |
| Administering partner | National Coalition of Certification Centers (NC3), via participating institutions and NC3Certs |
| Platform variants | Allen Bradley and Siemens, with separate examination records |
| Student passing threshold | Score of at least 70% |
| Items (Virginia CTE records) | 50 test items per platform exam |
| Delivery (Virginia CTE records) | School-administered online; timing set by the instructor |
| Curriculum structure | 6 units, 5 labs, 1 project per platform |
| Student recertification | Not required |
Two traps to avoid. First, the 6 units, 5 labs and 1 project describe training components, not an exam timer or a requirement to take both platform exams. Second, a 70% passing threshold is not a pass rate. The threshold tells you the cut score; it says nothing about how many candidates pass. We cover that distinction in detail in the FPABS passing score article and the FPABS pass rate analysis.
Hardware Block: Relays, PLC Sections, I/O and Memory
The first cluster of topics is the physical and architectural foundation. These are typically the most approachable items, so make sure you never lose points here.
Control relays
Understand how an electromechanical relay uses a coil to open or close contacts, and why this logic is the ancestor of ladder diagrams.
- Coil energized versus de-energized states
- Normally open versus normally closed contacts
- Why a PLC replaces hardwired relay panels: flexibility, fewer wiring changes, easier diagnostics
PLC sections: input, logic and output
A PLC reads field devices, executes the stored program, and drives field devices. Be able to name which section does which job.
- Input section: receives signals from switches, sensors and transmitters
- Logic (processor) section: executes the user program
- Output section: drives lamps, contactors, valves and other loads
Input and output types: discrete, analog and digital
Know the signal character of each type and give a plausible example for each.
- Discrete: two-state signals such as a pushbutton or limit switch
- Analog: continuously varying signals such as a pressure or temperature transmitter
- Digital: numeric or coded values handled as data
- Outputs mirror these categories: a pilot lamp is discrete, a variable-speed command is analog
Memory types: ROM and RAM
Distinguish permanent from working storage.
- ROM: retains content without power; typically holds system firmware
- RAM: working memory for the program and data; volatile unless backed up
- Exam-style framing: which memory type would you expect to lose contents on power loss without battery or retentive backup?
Scan Cycle and Addressing Facts
Logic processing, covered by the topic on addressing and scanning, is where many candidates move from memorizing definitions to reasoning. The scan is a repeating sequence, and questions often ask what happens at a given moment.
- Read inputs: the processor captures the state of the input devices into an input image.
- Execute the program: logic is evaluated rung by rung against that image.
- Update outputs: results are written to the output devices.
- Housekeeping and communications: the controller services other tasks, then repeats.
Addressing is the other half. Every input, output and internal storage location is identified by an address, and the notation differs between platforms. Use manufacturer-labelled examples when you practice: Allen Bradley tags and addresses look different from Siemens symbolic and absolute addresses, and mixing the two in your head is a common source of confusion. Our difficulty guide explains why this kind of platform-specific reasoning is where preparation pays off.
Number Systems and Boolean Quick Reference
Numbering systems (decimal, binary, octal, hexadecimal and ASCII) reward drilling. The skills are mechanical, so practice until conversions are automatic.
| System | Base | Digits used | Quick check |
|---|---|---|---|
| Decimal | 10 | 0-9 | Everyday counting |
| Binary | 2 | 0-1 | Each position doubles in weight |
| Octal | 8 | 0-7 | Groups of three binary bits |
| Hexadecimal | 16 | 0-9, A-F | Groups of four binary bits |
| ASCII | n/a | Character codes | Maps characters to numeric codes |
Build your own practice set: convert a few decimal values to binary, then regroup the bits into octal and hex to confirm you land on the same number. Always verify by converting back.
Boolean functions: identity, AND, OR, NOT
Know each truth table cold and be able to translate between a Boolean expression, a gate-style circuit and a ladder rung.
- AND: output true only when all inputs are true (series contacts)
- OR: output true when any input is true (parallel contacts)
- NOT: inverts the input (normally closed contact logic)
- Identity: output equals the input
Ladder Logic and Programming Techniques
Programming techniques build directly on the Boolean block. Expect to read a short ladder rung and predict the output, or choose the rung that implements a stated behavior.
- Series contacts implement AND; parallel branches implement OR.
- Seal-in (latching) circuits use an output's own contact in parallel with the start input to hold the output on until a stop condition breaks the rung.
- Stop logic is typically wired so a broken wire fails safe: think about why a normally closed stop device is preferred.
- Output coils should generally be driven from one rung, because duplicate coil use creates confusing results.
Key Takeaway
For every ladder rung you study, say the logic out loud in plain words ("motor runs when start is pressed OR motor is already running, AND stop is not pressed"). If you can narrate it, you can answer almost any rung-reading question.
Write original practice rungs on paper for both platforms, keeping each labelled with its manufacturer so you build separate muscle memory. If you want a place to test yourself, the FPABS practice test site offers question practice aligned with these topics.
HMI, Protocols and Networks
Three topics cluster here: HMI integration, communication protocols and networks. They are conceptual rather than computational, which makes them easy to skim and easy to underestimate.
HMI integration
The human-machine interface is the operator's window into the process.
- Operators view status and enter commands; the PLC holds the control logic
- HMI elements (buttons, indicators, numeric displays) map to PLC addresses or tags
- A mismatch between an HMI element and its PLC address is a classic reason a screen "does nothing"
Communication protocols and networks
Know why devices exchange data and the general ways they connect.
- Protocols define the rules for message exchange between devices
- Networks link PLCs, I/O, HMIs and computers so data can be shared
- Be ready to reason about what fails when a link is broken: stale data, lost control or a lost operator view
Because the specific protocols differ by platform, rely on the manufacturer-labelled material in your course for names and details rather than guessing. This is one place where the Allen Bradley and Siemens curricula diverge in their examples even though the topic headings match.
Troubleshooting With the PLC
The final topic, basic troubleshooting, treats the PLC as a diagnostic tool. The key idea is that the controller can show you the state of inputs and outputs, so you can separate a field problem from a logic problem.
- Observe the symptom: what should happen, and what actually happens?
- Check the input: does the PLC see the device change state? If not, suspect the device, wiring or power.
- Check the logic: does the rung evaluate true when conditions are met? If not, suspect the program or addressing.
- Check the output: does the PLC energize the output? If it does and the load does not respond, suspect the output wiring or the load itself.
Allen Bradley vs. Siemens: Keep the Records Separate
Festo publishes two separate preparation documents with the same fourteen headings: one for Allen Bradley (document 272391) and one for Siemens (document 272390). Both are dated EN 2025.09. The shared topics mean the concepts transfer, but the examination records and manufacturer-labelled examples are separate.
| Aspect | Allen Bradley path | Siemens path |
|---|---|---|
| Preparation topics | 14 headings | Same 14 headings |
| Curriculum structure | 6 units, 5 labs, 1 project | 6 units, 5 labs, 1 project |
| Virginia record | 50 test items | 50 test items |
| Exam record | Separate | Separate |
| Practical advice | Practice with Allen Bradley notation | Practice with Siemens notation |
Do not treat these as one combined 100-question exam; the Virginia listings describe platform-specific records. If your institution only offers one branch, prepare only for that branch. Also be careful with pass-rate claims: a small historical study of external learners who took the Siemens exam after early-2021 training reported that all 18 passed, but that was a self-selected cohort, not an issuer-wide, current or Allen Bradley pass rate.
Cost, Eligibility and Registration Mechanics
Registration happens through participating institutions rather than as a standalone consumer purchase. The documented student requirements are training by an actively NC3-certified instructor using required equipment, completion of all hands-on labs, and an exam score of at least 70%. Proctoring and open-book or closed-book allowances are set by the school and the specific exam, so check with your instructor rather than assuming rules from any other source. More detail is in the FPABS requirements article and the exam dates and scheduling guide.
On cost, NC3's student certification charge is US$0, and Virginia's records likewise list no cost per test. That does not mean the whole pathway is free. Training tuition and institutional charges are separate. As one example, Virginia Western's bundled PLC and Sensors course (Allen Bradley branch only) lists estimated tuition of US$999 including online resources, lab equipment, software and the credentialing exam, with a local Electricity prerequisite. Note that the college's own pages disagree on course length (eight weeks versus four), and neither figure is an exam timer. That tuition is not a Siemens exam fee, and the prerequisite is not universal Festo eligibility. See the certification cost breakdown for the full picture.
A Domain-Ordered Review Plan
Since the topics are unweighted, a sequence that follows dependencies works better than one that follows guesses about emphasis. Build the foundation first, then logic, then systems.
Hardware foundation
- Control relays, PLC sections, input and output types, ROM and RAM
- Why first: every later topic assumes you can name the parts
Logic and numbers
- Addressing and scanning, numbering systems, Boolean functions
- Why second: these are drill-based and feed directly into ladder reading
Programming and systems
- Programming techniques, HMI integration, protocols, networks, basic design and operation
- Why third: they combine the earlier building blocks
Troubleshooting and full review
- Fault isolation drills, then a mixed pass through all fourteen topics
- Finish with timed practice on the practice test platform
Adjust the pacing to your course calendar, and remember that your instructor's lab schedule drives what you can practice hands-on. For background on what the credential is and how it is described, see what FPABS certification is, and for pathways after passing, the FPABS jobs overview.
Frequently Asked Questions
Students need an exam score of at least 70%. That is a passing threshold, not a pass rate, and it applies to the platform-specific exam you take.
Virginia's records list 50 test items for each platform exam, delivered online through the school. Timing is set by the instructor, and no fixed national timer was verified.
No. They are separate examination records, and the curriculum is not a combined requirement. Take the one your program offers.
No official percentage weights were verified, so none are assigned. Treat all fourteen preparation topics as worth reviewing and avoid relying on invented weightings.
NC3's student certification charge is US$0, but training tuition and institutional fees are separate and vary by school. Always confirm the full cost with your institution.